Broseley Grande Informações Técnicas

Consulte online ou descarregue Informações Técnicas para Fogões Broseley Grande. Broseley Grande Technical information Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
© 2007-2008 Broseley Fires Ltd
The
Installation and Operation Manual
York Grande Gas Stove
Grande
GAS STOVE
IMPORTANT NOTICETO BE LEFT WITH THE CUSTOMER
1
Revision: GB09b
Vista de página 0
1 2 3 4 5 6 ... 19 20

Resumo do Conteúdo

Página 1 - GAS STOVE

© 2007-2008 Broseley Fires Ltd The Installation and Operation Manual York Grande Gas Stove Grande GAS STOVE IMPORTANT NOTICETO BE LEFT WITH THE

Página 2 - CONTENTS

© 2007-2008 Broseley Fires Ltd ARRANGING THE LAYOUT OF THE LOGS Take care when handling the fragile ceramic logs. Only the ceramic logs supplied wit

Página 3 - 2. DIMENSIONS & DETAILS

© 2007-2008 Broseley Fires Ltd We hope you find the above instructions clear and precise. They need to be followed precisely so that you can enjoy the

Página 4 - 3. IMPORTANT INFORMATION

© 2007-2008 Broseley Fires Ltd (D) EXTINGUISHING THE STOVE BACK TO PERMANENT PILOT SETTING 1. From any heat setting, depress control knob fully a

Página 5 - 4. SITING THE APPLIANCE

© 2007-2008 Broseley Fires Ltd THE REMOTE CONTROL POSITIONING THE RECEIVER After fitting the batteries in the receiver and the hand set, place the r

Página 6 - 5. STOVE ASSEMBLY

© 2007-2008 Broseley Fires Ltd both 2,8mm, see llustration 2). Transmitter Function Set the Display • After connecting the battery or by simultaneou

Página 7

© 2007-2008 Broseley Fires Ltd • The “send“ symbol appears in the upper left corner of the display when either button is depressed. • The LED of the r

Página 8

© 2007-2008 Broseley Fires Ltd PLEASE EXPLAIN TO THE CUSTOMER THESE LIGHTING AND EXTINGUISHING PROCEDURES AND THAT IT IS NORMAL FOR THE STOVE TO GIVE

Página 9 - COAL LAYOUT

© 2007-2008 Broseley Fires Ltd 13. TROUBLESHOOTING THE GAS PILOT WILL NOT IGNITE OR STAY LIT • Ensure the gas is turned on at the alliance and the

Página 10 - LOG LAYOUT

© 2007-2008 Broseley Fires Ltd SERVICING INSTRUCTIONS Servicing should be carried out annually by a qualified installation engineer when the stove is

Página 11 - 10. OPERATING THE STOVE

© 2007-2008 Broseley Fires Ltd STOVE INSTALLATION SPECIFICATION & INFORMATION THIS SECTION TO BE COMPLETED AND SIGNED BY THE INSTALLATION ENGINEER

Página 12

© 2007-2008 Broseley Fires Ltd TECHNICAL INFORMATION NATURAL GAS PROPANE G20/I2H G31/I3P Heat Input (Gross) 6.9 Kw/Hr 6.9 Kw/Hr Su

Página 13 - THE REMOTE CONTROL

© 2007-2008 Broseley Fires Ltd Guarantee Dear Customer, Your decorative gas fire, when installed in accordance with the installation instructions

Página 14

© 2007-2008 Broseley Fires Ltd 2. DIMENSIONS & DETAILS A - Height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . …………….

Página 15

© 2007-2008 Broseley Fires Ltd THANK YOU FOR PURCHASING A YORK GRANDE GAS-FIRED STOVE Broseley Fires Ltd, a family run company, was founded as a gas

Página 16 - 12. TEST FOR SPILLAGE

© 2007-2008 Broseley Fires Ltd 4. SITING THE APPLIANCE The gas supply connection to the appliance is at the rear right hand side. The connection req

Página 17 - 13. TROUBLESHOOTING

© 2007-2008 Broseley Fires Ltd 5. STOVE ASSEMBLY Please check that the following components are included before you start on the assembly : Stove B

Página 18

© 2007-2008 Broseley Fires Ltd 6. FLUE CONNECTION The stove must be installed in accordance with current gas and building regulations BS5871: Part

Página 19 - STOVE INSTALLATION

© 2007-2008 Broseley Fires Ltd 7. GAS CONNECTION A minimum 15mm diameter gas supply pipe must be used to within 1 metre of the installation with t

Página 20 - Guarantee

© 2007-2008 Broseley Fires Ltd COAL LAYOUT Added Coals shown in white for identification only. Stage 1 Place the largest coal matrix firmly

Comentários a estes Manuais

Sem comentários